Project Name: | Oriole Park Branch Library |
Location: | 7454 W. Balmoral Avenue, Chicago, IL |
Client | Public Building Commission of Chicago |
- | Richard J. Daley Center, Room 200, Chicago, Illinois |
- | - |
Project Amount: | $4,079,000.00 |
Lead Employees: | Ruben Avelar |
Start / End Dates: | Start: 2/1/2003, Completed 3/1/2004 |
One-story 14,000 S.F. main and 600 S.F. accessory building. The steel superstructure is supported on concrete foundation walls and spread footings. The roof is flat metal deck with single membrane roofing except for the metal standing seam barrel vault roof over the lobby. Exterior walls are face brick with CMU back up, with aluminum framed windows with insulated glass. The floor is a concrete slab on grade. The interior ceilings are suspended tile and gypsum board. The interior walls are gypsum board on metal studs, while the interior floor finishes include terrazzo, ceramic tile, and resilient flooring and carpet. Ruben Avelar, Project
Manager, was the Owner’s Representative, which services included coordinator
for the pre-construction design phase, coordination of construction phase, site
observation, conduct construction weekly meetings with the owner, architect and
general contractor. Main contact for the utility agencies and city departments
involved with the project. Review and monitor general contractor’s baseline and
updated schedules for contract compliance. Review and approve monthly payment
applications form the general contractor. Coordinate final project closeout
procedures. Monitor LEED certification rating process. |
|